Skip to content
← The MRGT Journal

When should you reorder green coffee by the container?

A busy roasting schedule can make the next purchase feel urgent before the stock records explain why. For a container buyer, a useful reorder decision starts with three things: coffee that is actually usable, demand that is reasonably supported, and the time needed to replenish it.

MRGT Editorial

Green coffee beans beside a blank planning sheet, with containers in the distance
Editorial illustration of green coffee purchasing planning.

A market signal is not your delivery schedule

The ICO's October 2026 report records September green coffee exports rising 5.8% year on year, with Robusta exports growing faster than Arabica. These are historical global shipment figures, not confirmation that your required lot is available for November dispatch.

Count usable stock first

Keep physically available, approved coffee separate from lots awaiting acceptance and stock already allocated to customer orders. Show incoming purchases in a separate column until their arrival and acceptance are confirmed. This gives the purchasing and roasting teams the same starting point.

Use recent consumption alongside confirmed customer commitments. A temporary promotion or one unusually busy week should be visible in the forecast rather than silently becoming the new normal.

Build the timeline backwards

Start with the date the roasting team needs approved coffee. Work backwards through arrival handling, any applicable checks, transit, loading, booking and preparation at origin. Ask the relevant parties to identify which dates are confirmed and which remain estimates. A sailing date alone does not describe the full replenishment period.

Test a delay before placing the order

As a planning exercise, compare the expected schedule with a later-arrival scenario. Ask what happens to the production plan if one milestone moves. Decide internally how much reserve is appropriate for your business; there is no universal number of weeks that fits every buyer.

An internal planning rule can be: reorder threshold equals expected consumption during replenishment plus the reserve you choose. Keep the units consistent. This is a worksheet, not a guarantee of availability or a prediction of demand.

Turn the forecast into a clear enquiry

State the intended use, origin and quality requirements, required quantity, destination and preferred arrival window. Keep the latest acceptable date separate from the preferred date. Ask for shipment milestones in writing and revisit the plan when any milestone changes.

MRGT handles wholesale green coffee enquiries from one 20-foot container, approximately 19.2 tonnes or 320 bags of 60 kg. Availability and delivery terms are confirmed in the written quotation. Share your requirements through the contact page so the enquiry can be assessed against the actual lot and route.

Discuss your container requirements · Explore green coffee origins

References

  1. International Coffee Organization — October 2026 Coffee Market Report (September export data)
Back to Atlas ↗